Showcase: 200-part SLS PA12 run for a drone gimbal — lessons on nesting and dyeing
We just finished a 200-unit production run of a drone gimbal housing in SLS PA12 and wanted to share what worked.
Nesting: 2 builds of 100 parts each. Parts oriented at 15° to reduce stair-stepping on the curved face. Packing density 11%.
Post-processing: bead blasting → black dye → vapour smoothing on the visible surfaces only.
What we'd change: the 1.2 mm ribs came out ~1.05 mm; next time we'd design ribs at 1.5 mm minimum. Photos of the final parts attached below.